<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Higher Education &#8211; Waterloo MEP</title>
	<atom:link href="https://www.waterloo-mep.com/category/higher-education/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.waterloo-mep.com</link>
	<description></description>
	<lastBuildDate>Thu, 11 May 2023 15:23:55 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.waterloo-mep.com/wp-content/uploads/2022/05/cropped-Initials_Color-32x32.png</url>
	<title>Higher Education &#8211; Waterloo MEP</title>
	<link>https://www.waterloo-mep.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>UT-Austin – Winship Drama Building HVAC &#038; Electrical Renewal (Phase I, II, &#038; III)</title>
		<link>https://www.waterloo-mep.com/ut-win/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 06 May 2022 19:31:28 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=161</guid>

					<description><![CDATA[This project was focused on replacing the existing double-ended electrical switchgear.  Originally constructed in 1961, F. Loren Winship Drama Building is home to the UT Department of Theater and Dance. Phase one’s scope of work included the replacement of all existing electrical distribution, alongside the two main 12.5kV transformers, double-ended switchgear, and select main feeder<br><a class="moretag" href="https://www.waterloo-mep.com/ut-win/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>This project was focused on replacing the existing double-ended electrical switchgear.  Originally constructed in 1961, F. Loren Winship Drama Building is home to the UT Department of Theater and Dance.</p>
<p>Phase one’s scope of work included the replacement of all existing electrical distribution, alongside the two main 12.5kV transformers, double-ended switchgear, and select main feeder and branch circuit panelboards. Additionally, the automatic transfer switch was replaced and relocated to establish new code compliant room separation.</p>
<p>Phase two’s scope of work included replacement of three air handling units, as well as the existing chilled water piping, steam piping, and piping appurtenances, which were reconfigured based on the new unit structure. The engineering team also replaced four sump pumps, the domestic hot water generator and associated appurtenances, and revised the ventilation for the electrical room. Additional scope of work included removal and replacement of electrical service, five various exhaust fans, branch circuit panels, disconnects, starters, VFDs, and branch circuit wiring. Also lighting improvements were designed where needed for maintenance conditions.</p>
<p>The scope for the final phase included removing the existing air handlers, which were located on a small, cramped platform, and replacing them with a new roof mounted air handler and new steam reheat boxes. Additionally, structural reinforcement of the roof and a new curb were required to accommodate these changes.  Furthermore, this project also replaced a hot and a cold air handler, in a crowded basement, with a new hot and a new cold air handler with a shared return plenum.  Access to the hot unit was through the cold unit mixing section.  These air handlers were field built.</p>
<p>Throughout much of construction, ballet summer camp was held in this building with minimal effect on the campers or the construction schedule.</p>
<p>Project Title:  Winship Drama Building HVAC &amp; Electrical Renewal (Phase I, II, &amp; III)</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas at Austin</p>
<p>Project Size:  108,000 SF</p>
<p>Total Project Cost:  $1,010,000 (Ph I), $3,038,000 (Ph II), $2,225,305 (Ph III)</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-MSI – Main Wet/Dry Laboratory HVAC Renewal</title>
		<link>https://www.waterloo-mep.com/ut-msi/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 06 May 2022 19:21:31 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=156</guid>

					<description><![CDATA[Originally constructed in 1971, the Main Wet/Dry Lab Building (S13) serves as the primary research facility on the UT Marine Science Institute campus. The scope included installation of seven air handling units (60,900 CFM total), five laboratory exhaust fans (37,000 CFM total), three heating water boilers, two heating water pumps, two condenser water pumps, and<br><a class="moretag" href="https://www.waterloo-mep.com/ut-msi/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>Originally constructed in 1971, the Main Wet/Dry Lab Building (S13) serves as the primary research facility on the UT Marine Science Institute campus. The scope included installation of seven air handling units (60,900 CFM total), five laboratory exhaust fans (37,000 CFM total), three heating water boilers, two heating water pumps, two condenser water pumps, and three instantaneous, gas-fired domestic water heaters.  The chemical fume hood and laboratory exhaust system was completely reengineered into a manifolded system with airflow-tracking supply and exhaust valves to comply with NFPA 45.  The existing steam boiler system was replaced with a hydronic heating water design for easier maintenance and tighter temperature and humidity conditions.  New DDC controls were installed, along with a new central plant refrigeration exhaust system.  Construction was interrupted in late August 2017 by the nearby landfall of Hurricane Harvey, a Category 4 storm. The engineering team and the general contractor worked closely with UT for months to assist with campus restoration efforts, resulting in the additional replacement of two existing cooling towers.</p>
<p>Project Title:  Main Wet/Dry Laboratory HVAC Renewal</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas</p>
<p>Project Size:  48,020 SF</p>
<p>Total Project Cost:  $5,663,000</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin – Jackson Geological Building HVAC Replacement</title>
		<link>https://www.waterloo-mep.com/the-university-of-texas-at-austin-jackson-geological-building-hvac-replacement/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 02 Sep 2022 22:35:02 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=293</guid>

					<description><![CDATA[This project&#8217;s focus was the replacement of four air handling units (230,100 CFM total), two building chilled water pumps, DDC controls, the main electrical service gear and primary transformers, and existing panelboards. Additional scope of work included replacement of building laboratory exhaust fans (57,525 CFM total), new Phoenix lab controls, additional electrical capacity for select<br><a class="moretag" href="https://www.waterloo-mep.com/the-university-of-texas-at-austin-jackson-geological-building-hvac-replacement/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>This project&#8217;s focus was the replacement of four air handling units (230,100 CFM total), two building chilled water pumps, DDC controls, the main electrical service gear and primary transformers, and existing panelboards. Additional scope of work included replacement of building laboratory exhaust fans (57,525 CFM total), new Phoenix lab controls, additional electrical capacity for select Level 5 and 6 laboratories, and improvements to the outside air system to correct negative building pressurization issues.</p>
<p>Originally constructed in 1967, Jackson Geological Sciences Building is home to the University of Texas Jackson School of Geosciences. An  initial facilities programming report was developed in order to evaluate a number of options for upgrading the aging infrastructure. Based on this study, it was determined that more than a direct replacement was needed to allow for future growth. The engineers developed an innovate redesign of the building HVAC and electrical systems, reconfiguring the gear layouts and creating a new mezzanine level for installation of hot deck air handling units above the new cold deck air handling units.</p>
<p>Project Title: Jackson Geological Building HVAC &amp; Electrical Renewal</p>
<p>Project Location: Austin, Texas</p>
<p>Owner: The University of Texas at Austin</p>
<p>Project Size: 152,000 SF</p>
<p>Total Project Cost: $5,100,000</p>
<p>Services Provided: Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin – Sutton Hall Renovation</title>
		<link>https://www.waterloo-mep.com/the-university-of-texas-at-austin-sutton-hall-hvac-renovation/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 02 Sep 2022 22:36:50 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=301</guid>

					<description><![CDATA[This project consisted of replacing seven air handling units and the building chilled water pumps in Sutton Hall on the University of Texas’ main campus in Austin, Texas. Originally constructed in 1917, Sutton Hall is part of the UT School of Architecture and is considered a historic campus building. A facilities programming report was developed<br><a class="moretag" href="https://www.waterloo-mep.com/the-university-of-texas-at-austin-sutton-hall-hvac-renovation/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>This project consisted of replacing seven air handling units and the building chilled water pumps in Sutton Hall on the University of Texas’ main campus in Austin, Texas.</p>
<p>Originally constructed in 1917, Sutton Hall is part of the UT School of Architecture and is considered a historic campus building. A facilities programming report was developed in order to determine the best plan for replacing mechanical equipment with the least impact to the building structure and occupancy. A plan was developed to maximize floor space efficiency by combining four of the existing air handling units into two. In addition, UT requested the incorporation of preconditioning outside air coils into the units, which was accomplished using multi-level, custom AHU equipment. Design drawings were developed in 3-D to facilitate interference detection and evaluate constructability.</p>
<p>Project Title: Sutton Hall HVAC Renovation</p>
<p>Project Location: Austin, Texas</p>
<p>Owner: The University of Texas at Austin</p>
<p>Project Size: 70,000 SF</p>
<p>Total Project Cost: $1,320,000</p>
<p>Services Provided: Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-San Antonio – Biotechnology Sciences &#038; Engineering, Room 4.306, Laboratory Upgrades</title>
		<link>https://www.waterloo-mep.com/the-university-of-texas-at-san-antonio-biotechnology-sciences-engineering-room-4-306-laboratory-upgrades/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 06 May 2022 19:44:40 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=176</guid>

					<description><![CDATA[The Biotechnology, Sciences, and Engineering (BSE) building, located on the University of Texas at San Antonio’s campus, features laboratories for research and instructional learning for graduate students studying biology, electrical and civil engineering, chemistry, biomedical engineering, or biotechnology. In this project the engineering team was commissioned to add laboratory fume hoods, as well as establish<br><a class="moretag" href="https://www.waterloo-mep.com/the-university-of-texas-at-san-antonio-biotechnology-sciences-engineering-room-4-306-laboratory-upgrades/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>The Biotechnology, Sciences, and Engineering (BSE) building, located on the University of Texas at San Antonio’s campus, features laboratories for research and instructional learning for graduate students studying biology, electrical and civil engineering, chemistry, biomedical engineering, or biotechnology. In this project the engineering team was commissioned to add laboratory fume hoods, as well as establish a new chemical storage room.</p>
<p>Project Title:  Biotechnology Sciences &amp; Engineering, Room 4.306, Laboratory Upgrades</p>
<p>Project Location:  San Antonio, Texas</p>
<p>Owner:  The University of Texas at San Antonio</p>
<p>Project Size:  1,000 SF</p>
<p>Total Project Cost:  &#8212;</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin – Gearing Hall HVAC &#038; Electrical Renovation</title>
		<link>https://www.waterloo-mep.com/the-university-of-texas-at-austin-gearing-hall-hvac-electrical-renovation/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 06 May 2022 19:45:22 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=179</guid>

					<description><![CDATA[This project&#8217;s focus was to replace six air handling units, two building chilled water pumps, the main electrical service gear, utility transformer, and all cloth-insulated feeders. Originally constructed in 1932, Gearing Hall is part of the University of Texas College of Natural Sciences. A facilities programming report was developed to evaluate a number of options<br><a class="moretag" href="https://www.waterloo-mep.com/the-university-of-texas-at-austin-gearing-hall-hvac-electrical-renovation/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>This project&#8217;s focus was to replace six air handling units, two building chilled water pumps, the main electrical service gear, utility transformer, and all cloth-insulated feeders.</p>
<p>Originally constructed in 1932, Gearing Hall is part of the University of Texas College of Natural Sciences. A facilities programming report was developed to evaluate a number of options for upgrading the aging HVAC and electrical systems. Emphasis was placed on identifying a plan to minimize impact to the building structure. Existing multi-zone air handling units were reconfigured to include preconditioned outside air coils for improved humidity control within the building.</p>
<p>In addition, the engineering team worked closely with UT PMCS and the College of Natural Sciences to determine a suitable construction schedule, which met both the occupancy needs of the building users, and the budgetary limitation of the administration.  The original three-phase construction project was ultimately condensed to one-phase, with cost savings funding a full building relocation of occupants and critical equipment for the summer months.</p>
<p>Project Title:  Gearing Hall HVAC &amp; Electrical Renovation</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas at Austin</p>
<p>Project Size:  61,000 SF</p>
<p>Total Project Cost:  $2,300,000</p>
<p>Services Provided:  Mechanical, Electrical, Plumbing Engineering, &amp; MEP Commissioning</p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin – Townes Hall HVAC Renewal (Phase I, II, &#038; III)</title>
		<link>https://www.waterloo-mep.com/the-university-of-texas-at-austin-townes-hall-hvac-renewal-phase-i-ii-iii/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 06 May 2022 19:32:47 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=164</guid>

					<description><![CDATA[Originally constructed in 1952, Townes Hall is home to the University of Texas School of Law. This project was focused on replacing six air handling units, two building chilled water pumps, the main electrical distribution panel, and approximately one-third of the electrical panelboards. An initial facilities programming report was developed to evaluate a number of<br><a class="moretag" href="https://www.waterloo-mep.com/the-university-of-texas-at-austin-townes-hall-hvac-renewal-phase-i-ii-iii/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>Originally constructed in 1952, Townes Hall is home to the University of Texas School of Law. This project was focused on replacing six air handling units, two building chilled water pumps, the main electrical distribution panel, and approximately one-third of the electrical panelboards.</p>
<p>An initial facilities programming report was developed to evaluate a number of options for upgrading the aging HVAC and electrical systems.  As part of this study, it was determined that a three-phase implementation of AHU replacements would be needed to completely renew all fifteen existing AHU systems.</p>
<p>Phase 1 scope of work included the replacement of five legacy multi-zone and constant-volume AHUs with six variable speed AHU systems (57,000 CFM total), including preconditioning outside air coils for improved humidity control within the building.  The engineering team worked closely with the UT Project Manager and the Building Manager to develop outage phasing plans as part of the bid documents, limiting both HVAC &amp; electrical building outages, as well as costly off-hour contractor work requirements.</p>
<p>Phase 2 scope of work included the replacement of four legacy multi-zone AHUs with six variable speed hot and cold deck AHU systems (55,200 CFM total), including preconditioning outside air coils for improved humidity control within the building.  Additional scope of work included significant LED lighting and lighting controls upgrades, within the main auditorium.</p>
<p>The engineering team worked closely with the UT Project Manager and the Building Manager to develop outage phasing plans as part of the bid documents, limiting both HVAC &amp; electrical building outages, as well as costly off-hour contractor work requirements. As a result of the team&#8217;s redesign efforts, significant energy efficiency improvements were implemented along with improved equipment maintenance access.</p>
<p>Phase 3 scope of work included the replacement of two hot/cold deck AHU’s and six single zone AHUs (84,800 CFM total) located in a single mechanical room. The innovative design replaced the eight existing AHUs with four larger units: two hot deck and two cold deck AHUs. Additionally, six new air terminals were added within the mechanical room to provide zone control to the existing low pressure zone ductwork. The original aged electrical distribution equipment, including panelboards, transformers &amp; branch circuit wiring in the areas served by AHUs, was replaced and the electrical grounding systems was upgraded.</p>
<p>One particularly challenging aspect of this project was the constrained access pathway into mechanical room. The engineering team worked closely with equipment suppliers, riggers and UT PMCS to coordinate a unique design approach that insured all materials could be transported into mechanical room without damage to new equipment or to the adjacent finished building spaces.</p>
<p>Project Title:  Townes Hall HVAC Renewal (Phase I)</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas at Austin</p>
<p>Project Size:  167,000 SF</p>
<p>Total Project Cost:  $1,690,000 (Ph I), $1,970,000 (Ph II),  $1,830,000 (Ph III)</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-San Antonio – Flawn Sciences Building HVAC</title>
		<link>https://www.waterloo-mep.com/the-university-of-texas-at-san-antonio-flawn-sciences-building-hvac/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 06 May 2022 19:43:35 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<guid isPermaLink="false">https://www.waterloo-mep.com/?p=173</guid>

					<description><![CDATA[This project was focused on renovating two built-in place air handling units (172,000 CFM total). The scope of work included replacing the heating and chilled water coils, replacing all chamber insulation, upgrading the fire alarm system, installing new LED lighting, and upgrading all pneumatic controls to direct digital control. Originally constructed in the 1960’s as<br><a class="moretag" href="https://www.waterloo-mep.com/the-university-of-texas-at-san-antonio-flawn-sciences-building-hvac/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<p>This project was focused on renovating two built-in place air handling units (172,000 CFM total). The scope of work included replacing the heating and chilled water coils, replacing all chamber insulation, upgrading the fire alarm system, installing new LED lighting, and upgrading all pneumatic controls to direct digital control.</p>
<p>Originally constructed in the 1960’s as part of the main campus, the Flawn Sciences Building is home to the UTSA School of Biology and School of Chemistry. The engineering team worked closely with UTSA to phase the design so that construction was completed over the winter break, avoiding costly shutdowns, and down time during the semester. As a result of the team&#8217;s design efforts, improved space comfort was achieved along with improved equipment maintenance/access.</p>
<p>Project Title:  Flawn Sciences Building HVAC Renovations</p>
<p>Project Location:  San Antonio, Texas</p>
<p>Owner:  The University of Texas at San Antonio</p>
<p>Project Size:  —</p>
<p>Total Project Cost:  $550,000</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
