Lake Travis ISD Lake Travis Middle School

This project included a new $50 million middle school in Spicewood, Texas. This two-story 221,000 square foot building features an open central rotunda, cafeteria, library, stage, and administration area. The athletic amenities include four tennis courts, a practice field, a football stadium, a track, and two gymnasiums. The school is built into an extremely sloped elevation, creating a challenging project design for the team. The engineering team was responsible for the HVAC systems design, including ultra high-efficiency ground-coupled, geothermal heat pumps serving all classroom/teaching areas. Also designed and specified by the team were all aspects of the geothermal well field and heat pump piping located onsite as well as the first generation LED lighting system, football field lighting, and the design of a rainwater collection system.

Project Title: Lake Travis Middle School

Project Location: Spicewood, Texas

Owner: Lake Travis Independence School District

Project Size: 221,000 SF

Total Project Cost: $50,000,000

Architect: Fields & Associates Architects

Services Provided: Mechanical, Electrical, Plumbing, & Geothermal Engineering